| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| No | TOPIC TRAINING | SERTIFIKASI BNSP 2026 |
| Harga | Durasi | Januari | Febuari | Maret |
| 1 | Operator K3 Umum | Rp5,000,000 | 3 | 10-13 | 6-8 | 13-15 |
| 2 | Teknisi K3 Umum | Rp5,000,000 | 4 | 10-13 | 6-8 | 13-15 |
| 3 | Ahli K3 Umum | Rp5,500,000 | 4 | 10-13 | 6-8 | 13-15 |
| 4 | Operator K3 Migas | Rp5,000,000 | 3 | 17-19 | 14-16 | 8-10 |
| 5 | Pengawas K3 Migas | Rp6,000,000 | 3 | 17-19 | 14-16 | 8-10 |
| 6 | Authorized Gas Tester | Rp5,500,000 | 3 | 11-13 | 7-8 | 1-3 |
| 7 | Teknisi Ruang Terbatas | Rp5,500,000 | 3 | 18-20 | 20-22 | 6-8 |
| 8 | Insiden Investigasi | Rp5,500,000 | 3 | 11-13 | 20-22 | 22-24 |
| 9 | Teknisi K3 Listrik | Rp5,500,000 | 3 | 23-25 | 15-17 | 27-29 |
| 10 | Ahli K3 Listrik | Rp6,500,000 | 3 | 23-25 | 15-17 | 27-29 |
| 11 | Operator Scaffolding | Rp5,000,000 | 3 | 17-19 | 14-16 | 21-23 |
| 12 | Pengawas Scaffolding | Rp5,500,000 | 3 | 17-19 | 14-16 | 21-23 |
| 13 | POP Pertambangan | Rp5,000,000 | 3 | 24-26 | 20-22 | 26-28 |
| 14 | POM Pertambangan | Rp5,500,000 | 3 | 24-26 | 20-22 | 26-28 |
| 15 | POU Pertambangan | Rp6,000,000 | 3 | 24-26 | 20-22 | 26-28 |
| 16 | Rigger | Rp5,500,000 | 3 | 25-27 | 21-23 | 28-30 |
| 17 | HIMU | Rp6,000,000 | 3 | 30-1 Feb | 27-1 Mar | 20-23 |
| 18 | Loading Master | Rp6,500,000 | 3 | 25-27 | 22-24 | 14-16 |
| No | TOPIC TRAINING ENVIROMENT | SERTIFIKASI BNSP 2026 |
| Harga | Durasi | Januari | Febuari | Maret |
| 19 | Pemantauan & Analisis Limbah B3 Level Pengawas ( PLB3 ) | Rp7,000,000 | 3 | 23-25 | 14-15 | 7-9 |
| 20 | Pengoperasian Instalasi Pengelolaan Limbah B3 Level Operator ( OPLB3 ) | Rp6,500,000 | 3 | 23-25 | 14-15 | 7-9 |
| 21 | Penanggung Jawab Pengendalian Pencemaran Air Level Manager | Rp7,000,000 | 3 | 18-20 | 21-23 | 21-23 |
| 22 | Penaggung Jawab Operasional Pengolahan Air Limbah | Rp6,500,000 | 3 | 18-20 | 21-23 | 21-23 |
| 23 | Penaggung Jawab Pengendalian Pencemaran Udara Level Manager | Rp7,000,000 | 3 | 10-12 | 8-10 | 29-31 |
| 24 | Penaggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara Level Operator | Rp6,500,000 | 3 | 10-12 | 8-10 | 29-31 |